ø8.00 mm 8D Solid Carbide
Coolant-Thru Drill

The 8D ratio tackles deep-hole applications where chip evacuation and heat build-up are the primary failure modes. Internal coolant channels maintain cutting temperature and flush chips continuously, enabling consistent hole quality in steel, stainless, and ductile iron at depths where standard drills fail.

Flute 76.00 mmShank ø8.00 mmOAL 116.00 mm140° PointTiAlN CoatingMOQ 1 pc

Get Pricing & Stock

Reference price

$68.83

Ref. factory price (USD)

Based on rod stock cost as of 2026-03-31. Final quotation may differ.

ø8.00mm 8D Coolant Drill

SKU: SCD-CTD-8D-D800

✓ Factory direct pricing

✓ MOQ 1 piece, stock sizes ship 1–5 days

✓ Custom lengths & diameters available

Technical Specifications

Cutter Diameter (D1 h7)ø8.00 mm
Imperial Equivalent0.3150"
Flute Length (L2)76.00 mm
Shank Diameter (D2 h6)ø8.00 mm
Overall Length (L1)116.00 mm
Depth Ratio8D (8× diameter)
Point Angle140°
Helix Angle30°
Number of Flutes2
CoatingTiAlN / TiSiN Oerlikon Balzers BALINIT®
SubstrateK10/K20 Solid Carbide 10% Co binder
CoolantInternal twin-channel
ToleranceDIN 1414 · ISO 5419
MOQ1 piece
Lead Time (standard)1–5 business days
Lead Time (custom)5–15 business days

8D Dimensional Drawing

ø8.00mm 8D carbide coolant-thru drill dimensional drawing — L2=76.00mm OAL=116.00mm
D1 h7
ø8.00
L2
76.00
D2 h6
ø8.00
L1
116.00
Point
140°
Ratio
8D

ø8.00mm 8D — recommended applications

  • Automotive fuel-system components
  • Hydraulic manifold ports
  • Gearbox housings
  • General precision engineering
Machining Tip: ø8.00mm represents the sweet spot for coolant-thru drilling — feed rates of 0.15–0.25mm/rev are achievable with correct coolant pressure (20–40 bar).

Recommended Work Materials

42CrMo4 Steel
EN-GJS-500 Ductile Iron
304 Stainless Steel
AlSi10Mg Casting

8×D Deep-Hole Coolant-Thru Drill

Deep hole — steel, stainless, ductile iron, oil galleries

8xD deep hole drilldeep hole carbide drillcoolant through deep drillingstainless steel deep hole

Ready to Order ø8.00mm 8D Coolant Drills?

Factory direct. MOQ 1 piece. Tell us quantity and delivery date — we'll confirm lead time and pricing within 4 business hours.